Project Description
A 5,000 sq. ft. addition to A 150-year-old church; including a Fellowship hall, Warming Kitchen with generous cabinet space, Large Pantry, and storage area for catering needs. A 3 Phase 600 Amp electrical service was needed for the 15 Ton HVAC System and kitchen equipment.
The exterior is Vinyl siding with PVC trim and a 50 yr. roof, Energy star windows and Fiberglass exterior doors.
Site-work included an asphalt circular driveway under the new Port Cochere, accented by 16” columns on Brick Bases and generous landscaping.