Harborview Medical Building

Project Description

This project is the development of a 7.3-acre site, with a built to suit 40,000 SF medical office facility on 3.0 acres of the site.  The building will be a 3-story steel framed building with 200 parking spaces.  The site work, grading, drainage, utilities, and right of way improvements were completed in May 2018. Construction of the shell building started in September 2019.

Airline Business Park

Project Description

This is a 15-acre mixed-use development, consisting of six multi-tenant condominium style buildings totaling 130,000 SF, and a separate mini-storage facility, all with required site improvements. All six of the condominium buildings were constructed by ACS, some for sale or rent to meet an owner’s specific use requirements, such as loading docks, or showroom space.

R. E. Michel

Project Description

This project is the development of a 3.8-acre site, with a built to suit 15,300 SF retail/warehouse facility on 1.9 acres of the site.  The building was constructed using a pre-engineered metal building with shared utility and storm drainage facilities, and roadway frontage improvements.  The R E Michel facility was completed and sold in November 2013.

Olde Towne Starbucks, Portsmouth Virginia

Project Description

This development, which includes an 1,850 SF retail store with all parking and site improvements, a Design/Build project for lease to Starbucks Corporation. It was designed on a small infill lot in Downtown Portsmouth and built in conjunction with two single family homes with shared site access and parking.

View 331 Effingham Layout

Lucas Professional Building

Project Description

This development is a 13,500 SF brick office building, with required parking and site improvements, located in Downtown Portsmouth, VA. This project was a Design/Build for State Senator L. Louise Lucas. ACS developed the site through Empowerment Zone and Enterprise Zone programs.

Atomized Products Group (APG)

Project Description

This project was a build to suit heavy industrial manufacturing and office facility for a Texas based company expanding to the Hampton Roads area.  ACS assisted the owners in site selection, coordination with the city for zoning approval, and was then responsible for design and construction of the 20,000 SF building and all site improvements on the 2.1 acre parcel, including coordination with the owners specialized manufacturing equipment.  The building was completed in May 2014.

Alexander Baptist Church

Project Description

This project was construction of a new 26,000 SF church building, including a sanctuary with open cathedral ceiling, with associated parking and site improvements. After the original contractor’s costs came in over budget, ACS stepped in at the request of the church to value engineer, help redesign, and construct the building within the church’s budget.